How we work

01    —    FIRST STEP

Project Definition

We define the style and characteristics of the home with the client, adapting to new or existing projects.

We transfer the information to the factory, where the technical department develops the study of the project and the calculation of the cementation.

planols

02    —    SECOND STEP

Foundation and manufacture

We execute the cementation on the ground while we manufacture in parallel the concrete panels that will form the main structure.

The industrialized system allows us to advance phases in parallel, reduce deadlines and guarantee maximum precision in each element.

Discover how we manufacture our panels

WATCH VIDEO (0:16) ->
×

03    —    THIRD STEP

Structural Assembly

When all the elements are ready, the assembly is carried out on site in a few days, achieving a fast and precise execution.

From the start of the project, the usual time to have the structure completely assembled on the ground is between 3 and 4 months. If you want a fully finished house, turnkey, the overall term is approximately between 8 and 9 months.

3-4 months

STRUCTURE COMPLETELY ASSEMBLED ON THE GROUND

 

8-9 months

COMPLETELY FINISHED HOUSING,

TURNKEY

Discover how we carry out the assembly

WATCH VIDEO (0:16) ->
×

Discover how we carry out the assembly

WATCH VIDEO (0:25) ->
×